HEAVY CARGO & PLANT |
TO TREAT THE HEAVY CARGO
& PLANT, THERE'S LOTS THINGS TO CONSIDER SUCH AS VESSEL
TYPE, UNLOADING, TRUCKING, PACKING, ETC. THEREFORE
YOU NEED SOME LONG EXPERIENED FORWARDER, FINALLY
WITH THAT FORWARDER YOU CAN SAVE YOUR MONEY AND TIME. ONE
MORE CORE POINT, YOU MOVE YOUR CARGO TO THE FINAL DESTINATION SAFELY.
FOR THIS PROJECT YOU NEED A QUALIFIED SUPERVISOR AT
EVERY WORK SITE. |
1. TRANSPORTATION WAY
- EQUIPMENT DECISION &
USAGE : LOWBED-HEIGHT, GATHERING THE PROPER EQUIPMENT -
SOLUTION OF TRANSPORTATION PROBLEM : DRIVER (INPUT/WAIT ALL THE
CARGO-LOADING PROCEDURE/ETC)
- ACCEPTANCE OF LOCAL
POLICE STATION |
2. STEVEDORE -
VERIFY THE OCEAN FRIEGHT TERM ( FIO / FI / FULL B/T TERM ) -
STEVEDORE TIME & CARRIER (FORWARDING SCHEDULE AND WAITING CHARGE)
- SHORE CRANE / DUCK CRANE
/ BARGE USAGE - ALL AT CONSIDERATION |
3. SHIPPING TERM -
CARGO PACKAGE CONDITION / SHIPPING EXPIRATION DATE / THESE COULD
BE CONSIDERED AND
THEN YOU DECIDE THE SHIPPING TYPE INTO BULK OR SPECIAL CONTAINER. |
4. CAREER OF TREATING HEAVY
CARGO |
1)
OCT.2000. PLANT EXPORT ORDERED BY S.H FROM
YAMAGATA TO BUSAN BULK
: 78,000KGS / 1 PACKAGE TOTAL : 130TON CNTR
: 40FT OPEN TOP X 30EA/SHIPMENT |
2)
1995-2001 TEXTILE MACHINE-EXPORT ODERED BY E.H FROM
BUSAN - U.S.A / CHINA / GUATEMALA / etc BULK
& CNTR : 500CBM / 1 SHIPMENT ( 50TIMES ) |
3)
1995-2001 MACHINERY IMPORT ORDERED BY T.J FROM
NAGOYA TO BUSAN BULK
: 40,000KGS / 1 PACKAGE ( 10TIMES ) |
4)
SEP. 1996 PANEL MACHINE EXPORT ORDERED BY S.J FROM
INCHON TO INDONESIA BULK
: 1,300CBM 500,000KGS / 1 SHIPMENT |
¡Ø
AUTOMATION INSTRUMENT OF TEXTILE MACHINE : FROM GERMAN / JAPAN /
ITALY
LOTS
IMPORT EXPERIENCE CAR
INSTRUMENT : GERMANY / LOTS IMPORTS EXPERIENCE |